Wednesday 09/16/09

Bob and I brought SeTherin home tonight.  I had gone down on Tuesday morning after work, accomplished the disassembly and lowered the mast.  Then late this afternoon we drove down with the trailer.

Shortly after arriving in Noank, we bumped into Dave Dickerson (Lindy), contracted for a delivery of a C&C 36 to Marblehead and in need of a ride out to the mooring area.  Brian met us when returned to the dock, helped us secure the mast, tidy things up and float the boat onto the trailer.  Then it was back to Glastonbury to SeTherin's winter home.

Mark Drive

Related Articles

Sunday 10/31/04

Sunday 10/03/04